Roof and sizing
Is your roof suitable for solar panels?
Solar output depends on more than the number of panels. Roof condition, orientation, shading and electricity use all affect whether the system is well matched to the home.
Roof condition comes first
Solar panels can last for decades, so the roof should be in suitable condition before the system is fitted. If the roof needs repair, strengthening or major works soon, solve that first.
- Ask the installer how they assess rafters, roof covering and mounting points.
- Confirm whether any extra timber support or access work is included.
- Avoid vague answers about leaks: the mounting method should protect roof weatherproofing.
Orientation and shading
A south-facing roof is usually strongest for total annual output, but east and west roofs can still be useful, especially if the household uses power in the morning or evening. Shading can matter more than compass direction.
| Roof factor | Why it matters | Quote question |
|---|---|---|
| South-facing | Usually highest annual generation. | What annual kWh is assumed and why? |
| East or west-facing | Can spread output into morning or evening. | Does this match when the home uses electricity? |
| Shade | Nearby objects can reduce output heavily. | Has the installer modelled trees, chimneys or neighbouring buildings? |
| Roof space | Obstructions can limit panel count and layout. | Can I see a roof layout before signing? |
Sizing the array
System size is normally expressed in kWp. A larger array may generate more, but bigger is not always better if most excess is exported at a low rate or if the roof layout is compromised.
- Match the design to annual kWh use and daytime demand.
- Check whether a battery, diverter or EV charging changes the recommended size.
- Ask for the expected annual generation and self-consumption percentage.
- Make sure the SEAI grant calculation is based on the eligible kWp band, not vague marketing copy.
Planning permission
Most ordinary domestic rooftop solar installations can proceed without planning permission, subject to conditions. Protected structures, conservation areas and unusual installations should be checked with the local authority before work starts.
Compare before you commit
Have a quote already?
Paste the quote text or upload the PDF and SolarGuide will flag missing grant, system design, export and warranty details.